4/6 Laning of Gandhidham (Kandla)–Mundra Port section of NH 8A (Extn.) (Approx. length 71.400 Km) in the State of Gujarat under NHDP Phase III through PPP on Design, Build, Finance, Operate and Transfer (“DBFOT”) basis
The Project Involves Four/Six Laning of Gandhidham (Kandla) – Mundra Port section of NH 8A (Extn.) in the State of Gujarat.
This DBFOT projects basically constitute up-gradation involving construction of 4/6-lane highway including Major and Minor Bridges widening and rehabilitation of bridges and culverts, construction of high embankment/elevated structures/ROBs wayside amenities and along the existing highways including provision of realignment and bypasses.

Disciplines
- Roads
- Transport and Infrastructure
Companies
Dorsch Consult (India) Private Ltd.
Client
National Highway Authority of India
Duration
From 2010 to 2016
Location
Gujarat , India
Project Activities
- Checking / Review of Detailed Engineering Designs / Drawings prepared by Concessionaire / EPC contractor
- Quality Assurance and Quality Control
- Monitoring of Progress
- Construction Supervision
- Environmental Management
- Operations and Maintenance
- Safety and Traffic Management