Consulting Services for Installation of 7 Wellhead Compressors (60 MMSCFD) at Location-A of Titas Gas Field Under Natural Gas Infrastructure and Efficiency Improvement Project
The project was financed by Asian Development Bank (ADB) and Asian Infrastructure Investment Bank (AIIB). The key project facilities included 7 Wellhead Compressors, Process Plant and Tie-in with existing facilities.

Disciplines
- Oil & Gas
- Industry & Energy
Companies
Dorsch Consult (India) Private Ltd.
Client
Bangladesh Gas Fields Company Limited
Duration
From 2018 to 2023
Location
Brahmanbaria , Bangladesh
Project Activities
- Laser Survey
- Analysis of Reservoir Data
- Study of existing process plants
- Prepare Design Basis, FEED Package
- Prepare Engineering Deliverables
- Prepare EPC Bid Package
- Assist BGFCL during EPC Bid Evaluation
- Review of Detailed Design
- Construction Supervision
- Assist During Testing and Commissioning
- Project Close-out